DBE Engineering

Main Image:
RECYCLED WATER RESERVOIR NO. 20
City of Chino Hills
Chino Hills, CA


This project consists of a 3.0 MG circular-welded steel tank located near the Chino-Central Avenue Fault in Chino Hills. The tank is fitted with seismic anchors and automatic seismic shutoff valves on the inlet and outlet. The tank is situated on an existing 4.0 MG potable water reservoir site.
 
Daniel Boyle Engineering
contact
opportunities
site map