DBE Engineering

Main Image:
EL CAMINO REAL 24-INCH AND 30-INCH DOMESTIC WATER MAIN
Carlsbad Municipal Water District
Carlsbad, CA


This project consists of 6,400 LF of 24-inch and 30-inch diameter cement mortar lined and coated steel pipe constructed in an existing major arterial roadway. DBE services included aerial mapping, geotechnical investigation, and preparation of an alignment study, Preliminary Design Report, final design construction documents and construction phase engineering services. Major project constraints included 10-inch and 16-inch fuel lines and a 30-inch high pressure gas main within the alignment window and heavy traffic loadings, all of which influenced the alignment selection and pipeline design.


 
Daniel Boyle Engineering
contact
opportunities
site map